Thursday, April 30, 2009
Tuesday, April 28, 2009
Granite Template
Fireplace Tile
This picture really doesn't do it justice.
Thursday, April 23, 2009
Cabinet Installation-Day 2
Came home tonight to find all the cabinets that could possibly be installed done. I know I'm partial, but it's going to be an amazing kitchen. Only two cabinets left to install: an upper cabinet that will be sitting on top of granite so can't go in until the granite is done and the new half bath vanity. I couldn't be happier. Really pleased that we choose to go with a painted cabinet for the island. I think it will really help break up all the cherry and add more interest.
This is looking into the kitchen from the family room. On the left is the pantry. The cabinet in the foreground in the middle will house our computer printer, a file drawer, and my husband's catch-all drawer. It is higher and will be the starting point of the raised peninsula. To the right of that will be our beverage refrigerator. Next, on an angle is a double recycle bin. The peninsula will seat two. Our plan is to keep our laptop on the raised countertop.
This shows the end cabinet and recycle bin. To the left of the recycle bin will be the dishwasher. To the right of the window will be a cabinet that will come down to the counter. It will have a door and three drawers.
This shows the second upper cabinet with glass. In the center is the cooktop. Above it will be a vent hood with chimney. The angled wall to the two upper cabinets will be tiled. Under the upper cabinets will have tongue and groove bead board topped with shaker pegs. I had shaker pegs in our old kitchen and really loved them, so wanted to incorporate them into the new kitchen.
This is the island looking from the angled cooktop. I plan on putting my dishes in the drawer. On the left is a small cabinet that has two shelves. On the right is a small bookcase for my cookbooks. The island will seat four. The island cabinets are White Antique Distress finish over cherry.
This is looking into the kitchen from the dining room. The two half walls will have square posts to the ceiling.
In the dining room is the new liquor cabinet. I'm sure it will also come in handy for serving. This will have the same granite top as in the kitchen.
I think my favorite cabinets are the two with the glass on either side of the cooktop and the end cabinet that will house the printer. I can hear my sister-in-law now...only you could get excited about having a file drawer!
Wednesday, April 22, 2009
Cabinet Installation-Day 1
Tuesday, April 21, 2009
Christmas in April
When I arrived home tonight, it was Christmas in April! I felt like a kid again on Christmas morning and was waiting with my brothers and sister for our parents to wake up so we could open presents. All the cabinets are covered with packing paper and labeled by item number. I found our cabinet design that was left for the installer who begins tomorrow. From that, I was able to identify which package was which on the design. Now I'm even more excited to see it all come together!
Saturday, April 18, 2009
More Hardwood Floors and Window Installation
The new window has been installed over where the kitchen sink will be. This will certainly provide a great view of our backyard.
Saturday, April 11, 2009
Hardwood Floors
Wednesday, April 8, 2009
Sheetrock has begun
A new entry has been framed out going from the dining room to the front foyer.
Tomorrow they will be starting on installing the hardwood. This will be extended from the kitchen into the dining room and front foyer.
Monday, April 6, 2009
We have a cabinet delivery date!
Other developments...
- The building inspector will be by tomorrow to look at things.
- I have a working sink in the basement.
- Carpet has been torn up from the dining room and the hardwood should go in next week.
- Tile has been removed from the front foyer. That will be getting hardwood also.
- Bob spent the day Sunday striping wallpaper from the half bath. You wouldn't think that such a small room would take so much time. He did a great job!
- Lots of plumbing work done today...The baseboard heat in the dining room was cut back to allow for the framing in of a new opening from the foyer and plumbing to the kitchen sink was roughed in. I'm sure there was more, just not sure what's what.
- More electrical work was also done today. We've decided on switch plates for the first floor. In the kitchen and half bath we're going with brushed nickel. All others will be light almond. We're switching to the paddle style switches, so best that the entire floor get redone.
Sunday, April 5, 2009
Window Roughed In
Wednesday, April 1, 2009
The Wall is Out
The utility sink in the basement has been setup, just not hooked up. That should happen either Thursday or Friday this week.
On Friday, the existing casement window will be coming out and the new 6 foot triple casement window roughed in. The window isn't expected to be available for a few weeks, however, the plumber and electrician need to know the exact location so they can complete their work.
If all goes well, the hardwood floors into the dining room should be going in next week.
I'm totally thrilled at how much has been accomplished in three short days!
Looking into the kitchen from the family room. The wall that was removed is on the far end to the left.
Looking from what will be the pennisula into the dining room.
Looking from dining room into the kitchen and backyard.